A Broward County demolition permit requires a completed permit application through the municipal portal, a NESHAP 40 CFR Part 61 asbestos survey for any structure built before 1980, written utility disconnect confirmations from FPL and the gas and water providers, and a 10-working-day advance notification to the Florida DEP Southeast District under FAC 62-257 when regulated asbestos-containing materials are present.
Residential permits run $150 to $600 depending on structure size and municipality. The full process takes 2 to 3 weeks for a standard residential project when you submit all documentation complete on the first filing.

What Do Broward County Municipalities Check Before Issuing a Demolition Permit?

NESHAP Asbestos Survey and Florida DEP Notification

Any structure built before 1980 requires a NESHAP 40 CFR Part 61 asbestos survey before the demolition permit is issued. When the survey identifies regulated materials, FAC 62-257 requires a 10-working-day written notification to the Florida DEP Southeast District before demolition begins.
Filing this notice late is the single most common cause of two-week project delays in Broward County. (Source: Florida DEP Asbestos Notification Requirements, floridadep.gov/air/air-permitting/content/asbestos)
Knowing what asbestos and hazardous materials are present in older structures before you file the permit application prevents the most expensive scheduling conflicts.

Utility Disconnect Confirmations

The permit application must include written disconnect confirmations from FPL, the gas provider, and the municipal water and sewer authority before approval is issued.
FPL scheduling takes 3 to 7 business days, and gas and water take 2 to 5 business days, so starting both requests the same day you order the asbestos survey keeps the timeline on track.
The full utility disconnect sequence for a Broward County demolition project covers what documentation each provider requires.

Sunshine 811 Underground Utility Notification

Florida law requires a Sunshine 811 utility locate request at least two full business days before any ground-disturbing work begins. Some Broward County municipalities verify the 811 request number before issuing the permit.
File the 811 request the same day you submit the permit application so the wait period runs during permit review, not after.

Historic Preservation Review

Properties in Fort Lauderdale’s historic districts, including El Cid, Flagler Heights, and Sailboat Bend, require Historic Preservation Board approval before the demolition permit is issued, adding 4 to 8 weeks to the timeline.
Hollywood and Dania Beach designated properties go through those cities’ planning boards on the same extended timeline.
Confirm historic district status before scheduling the asbestos survey or utility disconnects to keep the project timeline accurate from the start.

How Long Does a Broward County Demolition Permit Take?

Residential Demolition Permit Timeline

A standard residential permit runs 2 to 3 weeks from complete application submission. The timeline breaks down as follows: asbestos survey and reporting (3 to 5 business days), DEP 10-working-day notice period running concurrently with utility requests, utility disconnect scheduling (3 to 7 business days), and municipal plan review (2 to 5 business days). The DEP notice period controls most residential projects.

Commercial Demolition Permit Timeline

Commercial permits run 3 to 5 weeks. Commercial structures typically have larger asbestos volumes, more utility systems to disconnect, and, in some cases, fire suppression decommissioning that requires a separate permit.
Fort Lauderdale commercial permits filed through LauderBuild add a commercial building code review that residential permits do not require. Historic or coastal zone commercial projects run 6 to 10 weeks.

What Does a Demolition Permit Cost in Broward County?

Permit fees vary by municipality and are calculated on structure square footage, assessed value, or a flat administrative rate. (Source: City of Fort Lauderdale LauderBuild fee schedule, lauderbuildonline.com)
  • Fort Lauderdale (LauderBuild): $600 to $2,500 residential
  • Hollywood: $150 to $500 residential
  • Pompano Beach: $200 to $600 residential
  • Broward County unincorporated: $150 to $400 residential
These figures cover the permit fee only. The NESHAP asbestos survey adds $300 to $800. Licensed abatement, when required, adds $2,000 to $8,000 depending on findings.
The full cost breakdown for a Fort Lauderdale demolition project covers every line item from survey to cleared lot.

How Does the Permit Process Differ Between Fort Lauderdale, Hollywood, and Pompano Beach?

Fort Lauderdale requires all applications through LauderBuild, the city’s digital-only portal. Paper applications are not accepted.
The portal requires a registered contractor account, scanned asbestos survey, utility disconnect letters as PDF attachments, and a site plan. First-time users who do not set up the contractor account before the application is ready lose one to two business days.
Hollywood adds a zoning review for properties near the Hollywood Beach Boardwalk or within historic overlay zones. Properties on or near the Coastal Construction Control Line require a Florida DEP coastal permit in addition to the city permit.
Pompano Beach requires a dust and debris management plan for commercial demolitions adjoining occupied properties or public right-of-way. Fort Lauderdale and Hollywood do not mandate this for standard residential demolitions.
Florida’s residential demolition process covers the base requirements that apply across all Broward County municipalities.

How Do You Prepare a Broward County Demolition Permit Application to Avoid Delays?

Step 1 – Order the Asbestos Survey and Utility Disconnects on the Same Day

Both run concurrently with the DEP notice period. Doing one after the other adds avoidable days to a timeline already controlled by a mandatory 10-working-day wait.

Step 2 – Confirm Historic District Status Before Ordering Anything

A historic overlay designation changes the timeline from 2 to 3 weeks to 6 to 10 weeks. Include that information in the project schedule before paying any fees, not after the permit application is filed.

Step 3 – Verify the Municipal Portal Requirements Before Assembling Documents

Lauder Build, Hollywood, and Pompano Beach each have different document formats and attachment specifications. A format rejection adds 3 to 5 business days to the review timeline and is entirely avoidable with one pre-application check.

Step 4 – File the Sunshine 811 Request the Same Day as the Permit Application

The two-business-day locate wait then runs during permit review, not after approval. Knowing when a property is ready for demolition before the permit process begins confirms the project scope before you pay any fees.

FAQ

What is required for a demolition permit in Broward County?
A completed application, NESHAP asbestos survey for pre-1980 structures, written utility disconnect confirmations, Sunshine 811 utility locate request, and a 10-working-day Florida DEP notice under FAC 62-257 when regulated asbestos materials are found.
How long does a demolition permit take in Broward County?
Standard residential permits take 2 to 3 weeks. Commercial permits take 3 to 5 weeks. The 10-working-day Florida DEP notice period is the controlling variable. Historic district reviews add 4 to 8 weeks.
How much does a demolition permit cost in Broward County?
Residential fees run $150 to $2,500 depending on municipality. Fort Lauderdale LauderBuild permits run $600 to $2,500. These figures cover the permit fee only, not the asbestos survey or abatement.
Does Fort Lauderdale require a separate permit portal from Broward County?
Yes. Fort Lauderdale uses LauderBuild, a digital-only portal separate from the Broward County Building Division. All Fort Lauderdale demolition permits must be filed through LauderBuild with a registered contractor account. Paper applications are not accepted.
What happens if asbestos is found after a Broward County demolition permit is issued?
Work must stop. A Florida DEP 10-working-day notice under FAC 62-257 must be filed before demolition resumes. The existing permit remains valid during the notice period. Licensed abatement must be mobilized before work continues.

We Handle the Paperwork So You Do Not Have to Find Out

The most expensive part of a Broward County demolition permit is not the fee. It is the two-week delay from a late DEP notice, a missing utility letter, or a LauderBuild document format rejection.
Florida Demolition Experts manages the full permit process: asbestos survey coordination, DEP notification filing, utility disconnect scheduling, and portal submission across Fort Lauderdale, Hollywood, and Pompano Beach. Call us before you submit the application.
Share the Post:

Nataliya

CEO & Founder Florida Demolition Experts

Nataliya is the founder and owner of Florida Demolition Experts, a trusted provider of residential and commercial demolition services across Florida. With years of experience in the industry, Nataliya is passionate about delivering safe, efficient, and environmentally responsible demolition solutions. She specializes in helping homeowners, contractors, and developers navigate the demolition process with confidence and clarity.

Related Posts

Website by TAO Digital Agency