License Number: 86-4496-D-X

DBA FLORIDA DEMOLITION EXPERTS

How Do You Get a Demolition Permit in Fort Lauderdale?

demolition permit Fort Lauderdale

Getting a demolition permit in Fort Lauderdale starts with one question most homeowners skip: which office actually handles your property?

The City of Fort Lauderdale and Broward County are two separate permit authorities with different applications, fees, and timelines. Getting that wrong costs you weeks before a single wall comes down.

Who Issues Demolition Permits in Fort Lauderdale?

If your property sits within Fort Lauderdale city limits, you apply through Fort Lauderdale Development Services at 100 N Andrews Ave. If your property is in unincorporated Broward County, you apply through the Broward County Building Division at 1 N University Drive, Plantation.

Check your jurisdiction first. Pull up your parcel number and confirm it on the Broward County Property Appraiser website before submitting anything. If you are still mapping out the full project sequence, the pre-demolition steps for Fort Lauderdale properties walk through jurisdiction confirmation as step one.

What Does a Demolition Permit Cost in Fort Lauderdale?

Residential demolition permits run $500 to $2,500. Commercial permits run $1,500 to $8,000. Both figures depend on the structure’s size and the assessed property value.

For the full picture of what you are actually paying for beyond just the permit, the residential demolition cost breakdown for South Florida covers every line item.

A failed inspection adds $500 per violation in re-inspection fees. If you start work without a permit and get caught, the after-the-fact permit costs more, the inspection covers everything already done, and it creates title problems if you have an active construction loan.

What Documents Do You Need to Apply?

Florida Building Code Section 105.1 requires the contractor’s active DBPR license number, proof of general liability insurance, a project scope, and a property survey.

For any structure built before 1981, you also need an EPA-certified asbestos inspection report before the permit office accepts your application.

Do not hand over a deposit before you have confirmed the contractor’s license is active. Verifying a demolition contractor in Broward County takes five minutes through the DBPR lookup and protects you from a contractor who cannot legally pull permits.

If the asbestos inspection finds regulated materials, the contractor must file a 10-working-day advance notification with Florida DEP under NESHAP 40 CFR Part 61 before any structural work begins. That notification is separate from the permit, and both must be active before demolition starts.

Historic Properties

Properties in Fort Lauderdale’s designated historic districts also require a Certificate of Appropriateness from the Historic Preservation Board before the permit is issued.

That review adds four to eight weeks. Confirm historic designation status through Fort Lauderdale Development Services before you apply for anything.

How Long Does a Demolition Permit Take in Fort Lauderdale?

Residential permits take three to six weeks from the date you submit a complete application. Commercial permits that require environmental review from Broward County Environmental Protection take five to ten weeks.

The clock starts on a complete submission, not an incomplete one. A missing asbestos report or an unsigned contractor document sends your application back to day one.

Start the permit application the same day you contact utilities for disconnection, so both timelines run in parallel and your demolition start date does not slip waiting on paperwork.

What Other Permits Apply to a Fort Lauderdale Demolition?

The demolition permit only covers structural removal. Depending on your project, you may also need:

FDOT lane closure permits for work adjacent to state roads: $2,000 to $5,000, submitted at least 10 business days before work begins
Broward County right-of-way permits when equipment or debris staging touches a public sidewalk or road. A separate pool permit regardless of whether the pool is being removed or filled

Florida Statute 556.105 also requires a Florida 811 call at least two business days before any ground is broken. That is a legal requirement, not a courtesy, and it applies to every project in Fort Lauderdale regardless of size.

What Happens If Demolition Starts Without a Permit?

Fort Lauderdale Development Services and Broward County Building Division both issue stop-work orders on the spot when unpermitted demolition is found.

Work stops until an after-the-fact permit is approved. The inspection then covers everything already done, not just what is left.

Re-inspection fines are $500 per violation. If asbestos was disturbed without proper abatement, the Florida DEP can impose civil penalties of up to $25,000 per day per violation. That liability falls on the property owner, not the contractor.

Unlicensed contractors in Florida cannot pull permits. If a contractor tells you to pull it yourself, they are not licensed to do the work.

The legal and environmental exposure that comes with unpermitted demolition in Broward County falls entirely on the property owner, not the person who swung the hammer.

How Does the Asbestos Notification Affect the Permit Timeline?

NESHAP 40 CFR Part 61 requires an EPA-certified asbestos inspection for any pre-1981 structure. If regulated asbestos is found, a 10-working-day notification to Florida DEP is mandatory before structural demolition begins. That 10-day window runs separately from your permit review.

Having a permit does not mean you can start. Both the permit and the NESHAP notification must be active and in order before a wall comes down.

Asbestos abatement under FAC 62-257 must also be complete and have a clearance certificate on file before structural work begins.

What Waste Compliance Applies to Fort Lauderdale Demolition?

All demolition debris must go to a licensed facility under FAC 62-701. Broward County’s C&D landfill at 7101 SW 205th Avenue accepts residential and commercial debris.

Current tipping fees run $45 to $65 per ton. Illegal dumping of C&D debris carries civil penalties up to $10,000 per violation under Florida Statute 403.

Dust control is regulated under FAC 62-296.320(4)(c), which prohibits visible dust crossing the property line.

Fort Lauderdale limits demolition activity to 7 AM to 6 PM on weekdays. Weekend work requires a variance from Fort Lauderdale Development Services. According to OSHA, demolition carries a fatality rate more than twice that of general construction.

Frequently Asked Questions

How much does a demolition permit cost in Fort Lauderdale?

Residential permits cost $500 to $2,500. Commercial permits cost $1,500 to $8,000. A failed inspection incurs a $500 penalty per violation. Starting work without a permit means paying more for an after-the-fact permit plus covering all re-inspection fees.

Where do I apply for a demolition permit in Fort Lauderdale?

City of Fort Lauderdale properties apply at Fort Lauderdale Development Services, 100 N Andrews Ave. Unincorporated Broward County properties apply at the Broward County Building Division, 1 N University Drive, Plantation. Confirm your jurisdiction through the Broward County Property Appraiser before submitting.

How long does a Fort Lauderdale demolition permit take?

Residential permits take three to six weeks from the time of a complete submission. Commercial permits with environmental review take five to ten weeks. An incomplete application resets the clock. Submit the permit application the same day you request utility disconnections.

Is an asbestos inspection required before getting a demolition permit?

Yes, for any structure built before 1981. The EPA-certified inspection report is required before the permit office accepts your application. If regulated asbestos is found, a separate 10-working-day notification to Florida DEP under NESHAP 40 CFR Part 61 must be filed before demolition begins.

What happens if demolition starts without a permit in Fort Lauderdale?

A stop-work order is issued immediately. After-the-fact permits cost more and cover everything already completed. Re-inspection fines run $500 per violation. If asbestos is disturbed without abatement, Florida DEP penalties can reach $25,000 per day per violation, and the property owner is liable.

The Permit Is One Part of a Process Where Every Step Has a Deadline

Asbestos inspection, NESHAP notification, utility disconnection, and permit review all run on overlapping timelines. Miss one and you push everything back.

Florida Demolition Experts manages the full permit process for residential and commercial demolition across Fort Lauderdale, Hollywood and Pompano Beach.

Share the Post:

Nataliya

CEO & Founder Florida Demolition Experts

Nataliya is the founder and owner of Florida Demolition Experts, a trusted provider of residential and commercial demolition services across Florida. With years of experience in the industry, Nataliya is passionate about delivering safe, efficient, and environmentally responsible demolition solutions. She specializes in helping homeowners, contractors, and developers navigate the demolition process with confidence and clarity.

Related Posts

Website by TAO Digital Agency